View Single Post
Old 11-07-2005, 01:17 AM   #13
love it loud
Calibration Engineer
 
love it loud's Avatar
 
Join Date: Oct 2002
Location: Windsor, Ontario, Canada
Posts: 361
Re: 70short/step's 4 link install PICTURES

what is the purpose of building the box for the 4-link front mount? wouldn't it be better welded directly to the frame? there may be an obvious answer to this for 67-72's, but i'm not familiar with them, so figured I'd ask.. just out of curiosity

btw.. GREAT work so far!!
__________________
CANADIAN CONNECTION

Last edited by love it loud; 11-07-2005 at 01:17 AM.
love it loud is offline   Reply With Quote