Re: Project Git-R-Done - 72 K25
Well it's been a while since an update on the truck but it's not like I haven't been busy, there have just been alot of things that built up to this point. Now the plan is to blast and prime the K25 frame next week but before I could I had quite a few things to do before I could get to that point, so I'll break them down into a picture series.
Now first off I decided to use the cab I've fixed up for the C10 on the K25, but before I could take it off the C10 frame I had to get it out of the shop, and inorder to do that I had to put the bed back on the frame and before I could get the frame out, I had to fix the brakes on the Studebaker since it was in the way and wasn't safe to move since the brakes were completely gone. One master cylinder and two wheel cylinders later and I could lock the front brakes up.
|