Once I made sure the floor was even across the back wall, I drilled some screws in to hold the floor to the back wall for now.
Now I can start adding the other pieces in place.
First part to go in is the drivers side kick panel patch.
I'll sand the welds smooth, but here's how it looks before I do that.