View Single Post
Old 12-18-2009, 02:20 AM   #1
chevy71c10
Registered User
 
chevy71c10's Avatar
 
Join Date: Oct 2009
Location: Panama City Beach, FL
Posts: 228
1st Project: 71 C10 SWB

This is my first project of this size. Two months into the disassembly of my 71 C10. Current plans are for a 95 LT1, 700R4, four wheel disks, 2.5"/4" drop, air conditioning, rear fuel tank. Here are a few pics of the before and during the disassembly. The Cab will be removed this weekend and start wire-wheeling the frame. Timeline for the project is around 18-24 months, may be wishful thinking. Thanks for the great info I have found on this site.
Attached Images
     
chevy71c10 is offline   Reply With Quote