1st Project: 71 C10 SWB
This is my first project of this size. Two months into the disassembly of my 71 C10. Current plans are for a 95 LT1, 700R4, four wheel disks, 2.5"/4" drop, air conditioning, rear fuel tank. Here are a few pics of the before and during the disassembly. The Cab will be removed this weekend and start wire-wheeling the frame. Timeline for the project is around 18-24 months, may be wishful thinking. Thanks for the great info I have found on this site.
|