Thread: Project 67 C-10
View Single Post
Old 02-02-2010, 12:42 PM   #42
67-C10
Registered User
 
67-C10's Avatar
 
Join Date: Jul 2008
Location: Taunton, MA
Posts: 224
Re: Project 67 C-10

retourqued the rotors. all the shocks are bolted in, spacer is in under the tranny so motor is sitting at 3.5 degrees, spent some time gasket matching the intake too. Also did a little fiberglass repair on the ac duct box. get the tourque wrench this weekend and the motor will be buttoned up, just have to find a 750 holley at the swap meet in april and should run minus distributor.
total hours: 84 hours
__________________
67 C10 2wd Stepside (to be fleetside), Factory AC truck, Big Back Window, just got a 6.0/6l90e to jam in it now.....
Needed: paint and lots of it. and i'm sure lots more misc. parts.

Project 67 short step Build Thread

01 Sierra Crew 6.0
2015 Ford F150 Work gave me truck i really wouldn't buy a ford.

Last edited by 67-C10; 02-03-2010 at 01:00 AM.
67-C10 is offline   Reply With Quote