Re: 1972 Blazer - 'Bullet' Project
Keep up the good work its really starting to take shape.
My timeframe for progress effeciency is the exact opposite of you. Since I live in a humid subtropical environment I try to get as much work done as possible from mid November thru Early April. That is when the shop is usually a steady 50-65 degrees. Anything outside of that time frame is miserable. With shop temperatures from 90-105 degrees, with 85-100% humidity. In July and August all I want to do in the shop is sit in front of a fan and chug Gatorade. I cant do bodywork because sweat gets all over the body filler and primer; and if you paint sweat will drip onto the fresh coat of paint!
Last edited by 1956cameo; 02-03-2010 at 04:32 PM.
|