Thread: "G&S project"
View Single Post
Old 09-08-2010, 01:38 PM   #67
nbpro
Account Suspended
 
Join Date: Dec 2008
Location: Huntsville,AL
Posts: 2,119
Re: It ain't over till it's over.

We mounted angle iron along the bed rails, the two sides and the back of the bed. Built a frame out of pressure treated 1x2's. Went to a local sign shop and got some aluminite(two pieces of aluminum sandwitching corregated plastic, very light) scraps, in other words signs they had discontinued or was no longer able to use. Come in 4x8 sheets 3/8's inch thick. $20 for two sheets. Screwed it down to the frame, added a sheet of plywood underneath for strength and mounted it on the bed Plan on covering it with tonneau cover material bought online.
Name:  HPIM0391.jpg
Views: 1036
Size:  28.8 KB

Name:  HPIM0392.jpg
Views: 1051
Size:  38.1 KB

Name:  HPIM0388.jpg
Views: 1286
Size:  73.7 KB
Attached Images
  

Last edited by nbpro; 09-09-2010 at 12:51 AM.
nbpro is offline   Reply With Quote