Now I'm working on the rear suspension. I got the rear axle cleaned up and ready to be trussed.
Then I worked on getting my link tabs and brakets built.
Mocked up.
Took my links to the machin shop to get tapped. Still waiting to get those back.
Then I bobbed the rear frame off and started planning out my coil buckets.
The other specs are: dana 60 full chromolly and 35 outers, welded. Rear 14 bolt welded with 5.13's. Full hydro steering, TBI 350, th 400, np205-203 doubler, running 44's with recentered double beadlocks.