Thread: 87 CUCV project
View Single Post
Old 11-08-2012, 09:26 PM   #19
speedmachine
Registered User
 
Join Date: Jun 2007
Location: ontario,Canada
Posts: 120
Re: 87 CUCV project

frame reinforcement is complete, used 3/16 plate and cut it with the plasma cutter.. holes are for pressure washing the muck out. ive got the 4L80E mated to the NP205 but havent made the shifter mounting yet because i want to put the engine/tranny on the frame and clock the tcase to a favorable driveshaft angle before i weld the case adapter.
cab work is nearly complete.. after i did the rockers/corners and patched the floor i pulled the windsheild and found a hole... welded in a patch and another layer of bondo and i should be ready for a hot of paint. still have to decide what to do on the floor.. i cant decide between a carpet or a vinyl liner... i do like the idea of how easy it is to wipe a vinyl liner but their lifespan is short in the sun. lots more to come..enjoy
Attached Images
     
speedmachine is offline   Reply With Quote