Re: Project 69SWB
When I got to the front pillar I laid the old piece over the top and drill the holes so it would line back up correctly. Anywhere I need to seem the pieces together I just drilled a small hole all the way through and filled it in with the mig. I also opened up the floor over the support and fixed a little rust problem there, then coated it all real good with RustFix
Last edited by ~Whitey~; 01-09-2013 at 01:49 PM.
|