Re: tilly to the rescue
got a start on the big window conversion... i had already removed the inner panel from a parts cab, then blasted and etched it. after removing the small window inner panel from the replacement cab, the back wall was blasted and etched and prepped for the install. at the end of the day the big panel was glued to the ceiling panel with 3M panel cement and then clamped in place for 24 hrs. the plan is to fill this seam like chad did in his thread. i think that is a cleaner look and worth doing but that will have to wait till all the welding happens.
|