Re: My crewcab 4x4 cummins project
Well waiting for the lift pump and some russel fitting for the fuel lines, also have the proportioning valve coming all the brake lines and fitting... So back to body work till that stuff shows up... Blocked out the epoxy primer find my problems areas and got em all beat out and filled and blocked... Just need to get it up on stands and do the rockers and it will be ready for a coat of epoxy primer followed up by some Polly high build... Depending in how long the brake and fuel parts take to show up I might even get the box sided blocked down and shot in high build aswell
Posted via Mobile Device
Posted via Mobile Device
__________________
86 gmc short box..461bbc/th400 12.95@106mph
85 gmc crew cab 4x4 8"lift cummins conversion
|