Re: Project Patina Burb
Got alot done on the burb today. Trae (Inherited71) came over and helped with the interior wiring.
Got the temp sender installed and wired in for the factory gauge.
Got the backup lights wired up to the neutral safety switch.
Power Steering lines all hooked up.
Throttle linkage hooked up.
Installed the oil tube and dipstick, had to modify where it mounts to the exhaust manifolds a bit.
Didn't get the oil line installed. I didn't have the right fitting for the gauge and I don't have a tap kit to install it on the pan.
Also didn't get to setting the doors and the bodywork.
Posted via Mobile Device
|