Re: 75 Dually build
Worked on the fuel tank frame tonight. A fairly easy job, but somewhat time consuming. I still have to fab up a hold down for the tank, but that should not be that hard.
My next job is going to be finishing up on the lower air bag mounts and getting them welded in place. Then I will get on either the shock mounts, or the fuel line plumbing.
|