Quote:
Originally Posted by Xeen
The cab is looking great Vic.
Whats the projected eta on the completion of all the cab work?
|
Thanks, Brian. I figure I have at least another 3-4 weeks of work on it. The floor and firewall are all fitted up and ready to weld in, but I need to epoxy primer the area under the dash before doing so. A bit too cold for that right now. Then, it will still need replacement kick panels, lower door pillars, rocker panels and cab corners. At that point, it will be ready for bodywork. However, I plan to start on the bed shortening project before slinging any mud. Maybe by the time all the tinwork is done, spring will be around the corner. I much prefer to do bodywork with the doors open to cut down on the mess.