Re: 88 1500 daily driver project
Made lots of progress.
L98 and 5 speed are now mated.
Rebuilt the tb with new 65lb Injectors.
V8 motor mounts installed.
I'm hoping to get the engine and trans bolted in today.
Shouldn't take too long to get enerythimg buttoned up after that.
__________________
1955 belair Blown Pro Street cruiser
1971 Camaro Pro Touring
1973 Vega Drag Car
1970 C20 tow rig
|