View Single Post
Old 07-19-2014, 07:14 PM   #154
Advanced Design
Senior Member
 
Advanced Design's Avatar
 
Join Date: Jul 2012
Location: Oblong, Illinois
Posts: 7,017
Re: 48 Burb, bagged, 5.3, 20 year wait

The only way the floor would come out in one piece was to remove the perimeter flange and lift it up. I plan to use the flange for positioning the new floor ... so I went a bit medevial on the existing floor.

OK, I didn't really use the sledge hammer....just a drill, jig saw, sawzall to cut around the perimeter and drop the floor down. Happy to see the body metal is solid.
Attached Images
  
Advanced Design is offline   Reply With Quote