View Single Post
Old 08-03-2014, 08:13 PM   #179
Advanced Design
Senior Member
 
Advanced Design's Avatar
 
Join Date: Jul 2012
Location: Oblong, Illinois
Posts: 7,017
Re: 48 Burb, bagged, 5.3, 20 year wait

Here is the direction we are going for the floor fabrication. Can't recommend this approach for anyone else as it is unproven. Will probably be more stable than a wood floor though.

We are installing the cross channel pieces up under the original perimeter floor flange and plug welding through the flange.

Under we fabricated some support brackets with four 5/16 holes on each surface for plug welding.
Attached Images
  
Advanced Design is offline   Reply With Quote