Quote:
Originally Posted by clinebarger
1-2 Accumulator
Install new seal on Accm. Piston.
'82-'92, Install Piston in bore with "legs" up, Then Spring.
'93, Install Spring in Bore, Then Piston with "Legs" Down.
The '82-'92 Stack-up produces a later...Firmer 1-2 shift.
The '93 Stack-up produces a earlier...Softer 1-2 shift.
|
In my 93 I still want the firm shift. Is it okay to install the accumulator 82-92 fashion, or is that not possible in the 93 models?