Quote:
Originally Posted by 72K5CSTDarkOlive
Now that the tube is back it's crunch time. I have less than 2 months to put together a full rolling chassis before they're ready to mount the body back on the frame for final assembly.
1. I have most of the plumbing done
2. Assemble front axle and mount
3. E-brake cables
4. Mount Engine, Trans, and T-Case
5. Drive shafts
6. Radiator Core and Radiator.
7.
Anybody want come help?
|
Nice job! everything looks great! I would love to come and help out! It would sure beat the -20 degree weather that we are having here.