View Single Post
Old 05-06-2015, 06:06 PM   #8
68 short step
Senior Member
 
Join Date: Aug 2005
Location: tulsa OK
Posts: 3,070
Re: my twin turbo sleeper nova

with all the pipes, in postion, I cut the tack welds at the flange, then fully welded all the pipes, then final welded them to the flange... once they were fully welded in, I clamped them using a big hose clamp, cut the primany tubes flush with each other, welded on the collector, then cut collector to length, and then welded on my 3" v-band...






68 short step is offline   Reply With Quote