New pinion with 1350 series u-joints installed (hopefully it's right), Driveshaft is ordered, last of the air ride showed up, hard fuel line here.
I'm running out of stuff I can buy. I'll need to actually do more work on this thing soon
I needed to rebuild the trans crossmember so I stopped by the scrap yard and found a nice piece of steel that will work perfectly. I'll get that installed tonight and lock in pinion angle.
I'd like to start running brake and fuel lines once that's installed. I e been waiting to run those so I could make pass throughs on the trans crossmember so they can go across the inside of the frame rails.
Also, bending aluminum tubing. Boo! I got some spring benders and a different bender today to see how those work with the aluminum line.
The one I had, the aluminum didn't like very much.