Front end is about 75% complete. I just need to throw in the new front cross member and install my sway bar and I can call that done. I was able to tap new threads for the left side dust shield. I got the rotors installed and set the bearing preload.
I also needed to clearance the snout of the new rotor to be able to fit the BOSS 338's. As you can see it didn't really take much to have them fit with no clearance issues.
Before
After