Re: Project Money green
Was raining this morning so me and the guys went to work on the suburban. Prepped and por 15 the pass side frame, installed front suspension and brakes. Finished bolting the plywood and installed the 3rd tire tub. Dropped the fuel tank to get at the remaining bolts and ended up springing a leak when I tightened straps down. A call to lmc and a new one is on the way.
Rolled it outside and power washed 4 months of grinding dust off of it.
|