Re: 69, no wait, 71 C10 Project
Dog days of summer for sure. I have been making very slow progress. Fuel tank is plumbed up to the regulator/filter. I'm waiting on installing the engine and trans so I can plumb the feed line to the engine. Swapped out the oil pan that came on the Connect and Cruise LS3 with the CTS-V one. Windage trays were the same part number and no real noticeable difference. But I still used the "newer" one. I hope to get the engine in within the next week or two, finish the brake line and fuel plumbing and send the rolling chassis to the body guy to install the cab, bed sides and fenders (which are all done and painted waiting for me!) and align everything. I have avoided the urge to go check out the new paint. That's been tough.
|