Small update time... I finally got the driveshaft installed...
Ignore the air management bracket hanging above it. I hadn't finished mounting it when I took this picture. I was so excited the driveshaft fit, I had to take the pic. This was aired out completely (no bump stops in the back right now).
I have since finished mounting the air management bracket, and the computer to the bottom side of the bed. I have the fuel sender installed in the tank, after it was wired and tested, so that's good. Tonight, I hope to get the fuel pump wires terminated and plugged in, the tank and hidden hitch installed, and start on the fuel lines. It's a little ambitious for only about 2 hours of work time available a day, but we'll see how far I can get.
I really want to have this thing fired up for a minute or two within the next two weeks, and running within a month.