Quote:
Originally Posted by kwmech View Post
So you're auguring the holes in, then pouring the slab around the posts? What holds the building to the slab besides gravity? Building codes are quite a bit different here in Calif
The holes are 24" around and 54"deep with 8 inches of concrete poured in the bottom for a pad so the poles dont settle into the ground. After the 8in pad setup and i got the poles where I wanted them I filled the hole with concrete. Here are a few pics of the progress, with the temps in my area pretty much at 100deg or over the last couple weeks work has slowed down on the shop.