View Single Post
Old 01-08-2019, 01:44 PM   #989
MP&C
Registered User
 
MP&C's Avatar
 
Join Date: Jan 2013
Location: Leonardtown, MD
Posts: 1,636
Re: 55 Wagon Progress

Thanks guys!!



Dotting the i's, crossing the t's... The insert for the bottom side of the console lid will be held in with a couple of 10-32 screws into a rivet nut. To insure the rivet nut is flush on the outside for the installation of upholstery, we want to provide a slight recess for the rivet nut flange. Here's the punch and die we made for the occasion, the bottom die is machined on the side to keep things from moving when clamped in the vise.


South Bend milling machine:













action shot:


https://www.youtube.com/watch?v=Z3hS...ature=youtu.be


inner parts installed...












ready for powder coat / epoxy primer, whichever comes first...



__________________
Robert
MP&C is offline   Reply With Quote