Over the last two week I’ve managed to remove both steps. Found rust holes filled with mud in both lower b-posts. Ordered new for each side along with the step supports. Just cut my own steps. Plan on covering them with a piece of stainless... so flat works better. Also finish welded the firewall in place. Came out pretty good, but I’m a perfectionist