View Single Post
Old 03-02-2019, 09:21 AM   #5
T/C
Registered User
 
T/C's Avatar
 
Join Date: Aug 2009
Location: Krum Tx.
Posts: 267
Re: Bagged 66 swb stepside project: Major Chip Hazard

At this point o got everything removed from the frame to start prepping for the step notch and frame z

However i like to have everything 100% prepared and am blessed to have a engineer cousin who can help me with formulas and math. More on this in the next post.

For now i got everything apart and pained the trans and bell housing while i waited. (Transmission is in great shape but needs new output shaft seal) it’s set to the side untill i have free time again or it’s tile to go back in.
Attached Images
  
T/C is offline   Reply With Quote