View Single Post
Old 03-03-2019, 08:26 PM   #13
T/C
Registered User
 
T/C's Avatar
 
Join Date: Aug 2009
Location: Krum Tx.
Posts: 267
Re: Bagged 66 swb stepside project: Major Chip Hazard

Well that’s that. Only thing left is to box it all in and plate the outside of the frame.i didn’t prepare well and don’t have any 3/16th plate at home.

I did get the rough cut templates ready to go so i can cut everything as soo. As i get the plate home this week.

I don’t normally grind welds but needed this smooth for the frame plates so welded out side and on the inside and left the full weld on the inside.

There is also a 1/4 gusset that runs along the entire angled cut and ties everything together internally.
Attached Images
     
T/C is offline   Reply With Quote