Just under 2 months and the engine and T56 are in the chassis! I'm hoping to have it running by the 22nd, we will see!
List of mods that have been done thus far:
Upper control arm bushings
Taller upper ball joints
Lower control arm bushings
Moved the lower control arms 5/8" forward
Larger lower control arm u bolts
Hotchkis sport springs, 5/8 of a coil cut off
High hump conversion
Tick Performance Street Heat Stage 1 LS1 cam
T56
Not too shabby for a couple months work!