I managed to get quite a bit done this past week. Working here and there when I could find time. I tore the stock brake booster bracket down, blasted and painted it. I am fairly confident that this was the first time it had been taken apart. What little grease was mostly sludge. The interior wiring is finally done. I mounted the ECM, Fuse/Relay center and TAC module to the floor. Re-installed all of the carpet and trim. I still need to adjust the brake light switch, but I need the booster installed to do that. I worked a little more on the cold air intake. I like it so far. I was one coupler short. I thought I could get away with a 4" straight coupler on the inlet side of the MAF, but the coupler bunched up really weird so I ordered another 3.75 to 4". I am going to paint it in the same VHT wrinkle paint as the valve covers.
I am going to order the fuel and trans lines this week. It's mostly odds and ends from here on out. So close I can taste it.