Quote:
Originally Posted by Keith Seymore
Still do. It will be 40 years in June.
I started as a co-op student (GMI = General Motors Institute) at the Flint Truck assembly plant. Since then I've worked in about 12 different final assembly plants, two proving grounds, three pre-production shops and one remote self contained design/build operation, in production launch, product design/development, and engineering program management.
I've worked on 6 generations of Full Size Trucks (Squarebody, GMT400, GMT800, GMT900, K2 and T1) one electric vehicle (Volt) and one low volume show car type build that I can't talk about.
K
|
Just noticed post 82: I didn't know when I made that comment that I would be done about two weeks later.
Last day worked was Feb 7; retired effective 3/1/2019. Total time with GM was 39 years 7 months.
K