Now that my floor-pan is fitting like I want it too.
I cut some more tubing and drill holes in the tubes
to use the seat mounting bolts
and welded that to my cross-bracing.
So I can remove the floor Again
I chose to do this for easy access
to the foot-well patches that I'm going to
replace. Once I fit both foot-well patches,
I will tack them in & put the floor back.
Then I will repair the lower A-Pillar.
Doing it this in this order I can keep
the location of the 2 lower a-pillar
and lower fender mounting holes in
the ( same ) location.
I used a small dremel tool
on the spot welds. It worked good
for this area.
.