View Single Post
Old 07-18-2019, 12:15 PM   #1045
dug224
Registered User
 
dug224's Avatar
 
Join Date: Dec 2011
Location: Mobile, Alabama
Posts: 996
Re: Dug's 1959 Fleetside

Carpet is 90% complete. Still have to heat tape the joints on both sides where the firewall meets the trans tunnel (basically under and to the right of the gas), properly attach the rear wall carpet and add whatever I can dream up to cover the edge of the carpet at the step. Covering each floor beam with carpet and tucking the horizontal carpet under it worked nicely. When I covered the beam I left the edges about 1/2" off of the floor leaving room for the tuck. Had to trim the insulation back 1/4" to get the carpet to tuck in under the beam carpet.
Name:  IMG_9100.jpg
Views: 741
Size:  75.8 KB
Name:  IMG_9107.jpg
Views: 687
Size:  69.1 KB
Name:  IMG_9111.jpg
Views: 699
Size:  51.3 KB
dug224 is offline   Reply With Quote