Re: Worst job at the assembly plant
Quote:
Originally Posted by Jemezcrusher
Putting my 50 3100 back together and spent two hours putting in the passenger side windlace. This had to have been the worst job at the assembly plant. I found it to be the biggest challenge of my whole build. THe video I watched on YouTube says that on a scale of 1-5 in difficulty, this one is a 5.
I would give it an 8
A little lube and profanity seemed to help. Will get the other side in today but never want to do this again
|
Took me about 10 minutes to do each side, check out my thread and see what I used.
__________________
LIL ERV the 50-3600
396 BBC stroked to 415 cid
Richmond 6spd over drive
C4 rear
Porter built a arms
Never give the Devil a ride,because he'll want to Drive!
|