Re: Son's 68 c10 Short Bed
Okay, so we have the gas door laid out. I think we are going to go with this plan but am going to take a few days to think about it. The plan is to sink it about half way, tig weld the high ribs to the gas door, and seam seal the gaps on the low ribs. Then just finish it off with body work where needed and paint.
|