I think that about wraps up the sheet metal work on the outside of the firewall. Tonight I got the E-Brake all figured out. What i ended up doing was I cut the studs out of the E-Brake so that i could reverse them and have everything except obviously the cable on the inside.
Then I used an idea that I read about somewhere on this forum but I cant remember where. Thanks to whomever had posted it, I cut the two mounting holes so that they would be slotted, this allowed me to still be able to install the thing. After that, I made up another plate out of some thicker gauge metal than the firewall. I did not trust just welding the studs directly to the firewall. It probably would have been fine but I didn't want to take any chances. So after I had the plate all made up, it was just a matter of plug welding it into position.