View Single Post
Old 02-28-2021, 02:43 PM   #392
The Rocknrod
Moderator

 
The Rocknrod's Avatar
 
Join Date: Aug 2011
Location: China Spring, TX
Posts: 7,280
Re: New 64 Stepper Project

Well if I can get the firewall insulated on the p-side I can install the heat/AC unit and run the heat/ac hoses and plug it in electrically. Install the drive shaft, get a battery, term those cables, fill it with all the oils/fluids... Yep maybe I could at least start it.
But I bought another set of headers so I have to change those out first.
After I start it I can get to the glass shop, then the muffler shop, Get tires and wheels, then the upholsterer in Houston. Get it inspected, go the county to register it...
Oh, I forgot to buy the wood, get it and finish it and install it.

Last edited by The Rocknrod; 02-28-2021 at 03:04 PM.
The Rocknrod is offline   Reply With Quote