Sorry I'm not the best a keeping my post up to date...
I've made significant progress since the last entry...
engine, transmission, suspension, radiator, AC condenser, aux trans cooler, and driveline are all in place.
I made a custom load center for all the wiring and mounted it and the PCM on the back side of the core support.
Fuel system, brakes, trans cooler, and cooling system all completed.
Engine fired and all systems checked and leak free.
Cab is all prewired with new M&H harness with the upgraded fuse panel.
A few more details including AC install and I'll be ready to start hanging sheet metal back on.
The cab will go on in the next few days. I had it on but took it back off to make it easier to wire the engine.
Anyway, I try to do something to it every day even if it's just little stuff.
Here's a few pics....in no particular order...