Thread: Project 69SWB
View Single Post
Old 01-09-2013, 01:44 PM   #98
~Whitey~
Registered User
 
~Whitey~'s Avatar
 
Join Date: Jun 2011
Location: Springfield, MO
Posts: 677
Re: Project 69SWB

When I got to the front pillar I laid the old piece over the top and drill the holes so it would line back up correctly. Anywhere I need to seem the pieces together I just drilled a small hole all the way through and filled it in with the mig. I also opened up the floor over the support and fixed a little rust problem there, then coated it all real good with RustFix
Attached Images
     
__________________
Jimmy
.69SWB Build.

Last edited by ~Whitey~; 01-09-2013 at 01:49 PM.
~Whitey~ is offline   Reply With Quote