Re: Holley 600 Rebuild / Overhaul
#13 NOW THAT THE RIGHT SIDES BACK TOGETHER LETS MOVE ON..
I AM GOING TO INSTALL THE REAR METERING PLATE.
THIS CARB DID NOT HAVE THE SMALL THIN PLATE THAT GOES WITH THE METERING PLATE SO I AM ADDING ONE WITH THE GASKET..IT PAYS TO KNOW THESE CARBS SO YOU CAN FIND THESE PARTS THAT ARE MISSING.
NEXT WE INSTALL THE NEEDLE AND SEATS. NOTICE THE GASKETS. I PLACE A DROP OF OIL ON THE O-RING SO IT GOES IN NICE.
BENCH SET THE FLOAT IT SHOULD BE LEVEL
Last edited by rage'nrat638; 07-25-2007 at 10:48 PM.
|