Re: 41DegreesSouth Build Thread
It's tucked up nice and high, level with the top edge of the window frame/door opening. Bit of extra storage space, and provision for gauges as well. On that front I had drilled a small hole top and bottom of the A pillar to make it easier to run wires. I hacked up a 'custom' gauge cluster (did you know that 2" medium NB pipe has just the right ID for gauges?!) that hold a clock and my O2 sensor gauge.
__________________
1972 K2500 Long Box
400/350
|