Re: Heinz 57
For a quick fix I did bondo on mine thinking I would need to fix it later with new quarter panels. It has held up another ten years. I figured a ten dollar can of bondo over a 500 dollar quarter panel until I got other things fixed first. But it has held up way better than expected.
__________________
72 3/4 ton blazer. 5 inch lift on 35 inch tires. 355 corvette engine with crane roller rockers, rv cam, edelbrock carb and intake with one inch spacer. Thrush Headers with flowmaster 40 duels. 4speed sm465 manual. 4 wheel disk brakes with Inboarded rear shock prerunner style mounts and shocks.
|