A bit more progress for the day
I started things off by checking the fit of a very rare blazer option, the bolt in low hump floor
Then I welded up all the holes in the new dash that were caused when it was removed from the doner vehical. I figured it would be alot easier to do all this now before it gets installed. Then I started fitting the floors, kick panels, A post bottoms and outer rockers. Everything is trimmed and cut awaiting blasting then it will just pop it self all back in
Kevin
LFD Inc.