Thread: Berthas Build
View Single Post
Old 02-16-2019, 02:42 PM   #89
dfairchild19
Registered User
 
Join Date: Feb 2010
Location: Dayton, OH
Posts: 255
Re: Berthas Build

July 2017 - Main pour complete and being finished!







I started on some insulation using some 3" rigid material that we had left over from a project that we run frequently. I wasnt able to finish it before winter last year or this year, but I was able to get the addition's roof insulated between the trusses which help hold the heat from all just escaping where most of it goes. Ill finish the rest once the truck is finished.




Bad picture but the final pour is complete and finished! The outside patio slab is one of my favorite parts of the barn. Lots of usable and covered space.




The lifts in the barn and ready to be installed.


And yet another pretty major milestone for me was the door install. This is exactly the view I had envisioned when I came up with the idea of a full view door, if not, better.






I recycled this barn light shade from over one of the horse stalls. I threw some iron pipe together and got it wired up as part of the minimum code requirement from the inspector.
dfairchild19 is offline   Reply With Quote