Thread
:
Berthas Build
View Single Post
02-16-2019, 02:48 PM
#
91
dfairchild19
Registered User
Join Date: Feb 2010
Location: Dayton, OH
Posts: 255
Re: Berthas Build
November 2017 - Lifts are now hooked up and operational. They have yet to be bolted down but they are very stable as-is.
I also finished to gravel along the side of the barn. I can now get to the rear of the barn without having to drive in the grass/mud.
Worked a little more on the insulation and finishing the walls. I wanted to get these sections up before I put anything on this wall.
New to me work bench top on the Lista cabinets
Now that most of my tools were halfway accessible, I could get things to a point that were workable in the new space and I could get back to work on Berthas...... eventually.
One last project for the barn. Storage shelves which are also steps to access the loft without a ladder. These are pretty handy except they only fit about half of the bottles that I planned to store on them. SMH
dfairchild19
View Public Profile
Find More Posts by dfairchild19