View Single Post
Old 12-16-2008, 01:50 PM   #123
MacAttack
283 Drama Queen
 
MacAttack's Avatar
 
Join Date: Dec 2004
Location: Surf City, CA
Posts: 2,435
Re: The 283 Rebuild Begins

NO WIRE HANGERS!!! EVER!!! *

*
Except when you’re trying to calculate the distance between your new towers and where they’ll end up on your frame.

Vice-gripped the initial tower location to get forward/backward location, sprayed grey primer through the mount holes, notched and radius’d out the frame, remounted the towers and used them as a drill jig for my clearance holes.

Bought extra thick McMaster-Carr machine set-up washers to cover any sloppy looking holes and trial bolted the hardware to the frame.

The wire hanger routine was to reach around the block - from below - to get the distance between the two motor mount slots. Just a common hanger with the hook cut off - small loops bent at both ends - and then bend the whole thing into a "U" shape, allowing measurement with a tape and a double check against the towers bolted on to the frame.

It’s within a quarter of an inch of being dead-nuts, and that’s plenty close enough for this application.

Attached Images
     
__________________
For about 12 years of my adult life I had a severe speech impediment.
My ex-wife never let me get a word in edgewise.
MacAttack is offline   Reply With Quote