View Single Post
Old 05-15-2017, 07:58 PM   #5
04ls1gto
Registered User
 
Join Date: Aug 2014
Location: Portsmouth ri
Posts: 363
Re: Project Money green

Was raining this morning so me and the guys went to work on the suburban. Prepped and por 15 the pass side frame, installed front suspension and brakes. Finished bolting the plywood and installed the 3rd tire tub. Dropped the fuel tank to get at the remaining bolts and ended up springing a leak when I tightened straps down. A call to lmc and a new one is on the way.

Rolled it outside​ and power washed 4 months of grinding dust off of it.
04ls1gto is offline   Reply With Quote